| DEPA - Metering & Regulating Stations of Natural Gas Transmition System Pipeline | Design and Construction of Main distribution Boards and UPS Panels for 18 stations | 1997 up to 2006 |
| DEPA - Metering & Regulating Stations of Natural Gas Transmition System Pipeline | Design and Construction of Main distribution Boards and UPS Panels for EL.PE., DRAMA, KILKIS, KOMOTINI, SERRES, XANTHI, THIVA, LAMIA | 2006 & 2008 |
| DEPA - Metering & Regulating Stations of Natural Gas Transmition System Pipeline | Design and Construction of Main distribution Boards and UPS Panels for EL.PE, MOTOR OIL, A.d.G, ALEXANDROUPOLI | 2008 |
| Greek-Turkish Border Metering Station | Design and construction of Main L.V. Switchboard, Distribution Boards & Distribution Pillars | 2006 |
| Fuel Transition Pipeline HAR – El.Venizelos Airport | Design and Construction of MOV Station Power Distribution SWGD, Main Power & Power Distribution Cabinets | 2001 |
| Hellenic Aspropyrgos Refinary - Truck Loading Revamping U8300 / U0010 | Design and Construction of Outdoor and Indoor Distribution Boards | 2003 |
| Hellenic Aspropyrgos Refinary - Crude & Vacuum Distilaltion Unit | Design and Construction of Marshalling Cabinets with PLC & Hot stand-by system for the new Refinery Unit | 2000 |
| Global Petroleum Company Albania SA - Durres Terminal | Design and Construction of Main L.V. Switchboard, Distribution Boards & Control panels for Safe Areas | 2000 |
| Truck Loading Station 7T | Construction of Marshalling Cabinets for the installation of 11 new bottom loading islands | 2004 |
| JP 158 - Zawia Terminal Oil Facilities - Libya | Design and Construction of Outdoor & Indoor Distribution Boards and Air Handling Units Control Panels | 2005 |
| JP 22H - GOSP – H – Oil Separation Plant - Libya | Design and Construction of Outdoor Distribution Boards, Control Panels and Junction Boxes IP57 | 2002 |
| JP 119 - Nafoora Gas List System Capacity Expansion & Gas Utilization - Libya | Design and Construction of Lighting Poles, Column Panels and Junction Boxes IP57 | 2002 |
| ELINOIL S.A. - Biodiesel | Design and construction of Main LV Switchboard & Distribution Panels. | 2006 |
| HALYPSCEMENT – ItalCementi Group Dyrrachion Cement Terminal – Albania | Design and construction of Compact Substation 6 kV / 0.4 kV 1000 KVA | 1998 |
| MAURITANO FRANCAISE DES CIMENTS Cement Mill in Mauritania | Design and construction of Main LV Switchboard, Distribution Boards for power, motors and control with PLC and SCADA, control and measuring system, engineering, start-up and commissioning for the project. | 2000 |
| HALYPSCEMENT – ItalCementi Group Substation No4 | Design and construction of Main Low Voltage Switchboard 4500A, 65 kA RMS, Segregation Form 4, According IEC 439-1, Fully Withdrawable. | 1999 |
| Clinker Cooler Filter | Design and construction of Medium Voltage Switchboard, Main LV Switchboard (PC-Power Center), 3200A, 65KA , Form 4 According IEC 439-1, Fully Withdrawable, Motor Control Center (MCC), Exhaust Fan 400KW Switchboard (VFD1), Exchanger Fans 2X75KW Switchboard (VFD2), Power Supply Cabinet (DRR1), Digital Interface Cabinet (BU01), Measure Converters Cabinet (AT01), Remote I/O Cabinet (EXR1), Engineering, start up and commissioning for the project | 2001 |
| Cement Mill 5 & cement Transportation | Construction of Power Supply Cabinets (DR03 & DR04), Digital Interface Cabinets (B21U01 & B24U01), Measure Converters Cabinet (AT01), design, instrumentation, electrical erection, engineering, start up and commissioning for the project | 2006 |
| Cement Mill 7 | Construction of Power Supply Cabinet , Digital Interface Cabinet , Measure Converters Cabinet , design, instrumentation, electrical erection, engineering, start up | 2007 |